135-4949-1685
Dongguan Linoya Intelligent Technology Co., Ltd.
Contact address: Private Industrial Park, Qinghu Industrial Zone, Qishi Town, Dongguan City, Guangdong Province
Phone: 186-7340-9870
Email: acs009@linoya.com
The core of the power cord after the cable can not be doubled.
1 The pitch of the cable should be uniform and consistent with the requirements of the process card.
2 The take-up reel is arranged neatly and smoothly.
3 When the cable is formed, the last layer should be kept at a proper distance from the edge of the side plate of the take-up reel, and the cable should not be too full to avoid scratches on the surface of the cable plug.
40% cable power cord plug wiring color separation regulations
Two core RVV H03VV-F H05VV-F, brown, light blue SVT SJT ST, black, white
Three-core RVV H03VV-F H05VV-F, brown, light blue, yellow/green two-color SVT SJT ST, black, white, green
Four-core SJT ST, black, white, green, light blue RVV IEC53, yellow/green bi-color, blue, brown, black power cord
Copyright © 2020 Dongguan Linoya Intelligent Technology Co., Ltd.-Dongguan Hongjunwen Intelligent Technology Co., Ltd.
Dongguan Linoya Intelligent Technology Co., Ltd.
Contact address: Private Industrial Park, Qinghu Industrial Zone, Qishi Town, Dongguan City, Guangdong Province
Phone: 186-7340-9870
Email: acs009@linoya.com